Conveyor system modernisation

Retrofit of a 120 m conveyor route including replacement of frequency inverters, a new PLC and control-room visualisation.

About the project

Modernisation of 120 metres of conveyor route in running production — work took place during planned shutdowns so production never stopped.

We replaced the frequency inverters, deployed a new PLC and created a control-room visualisation with fault diagnostics per section.

This also included updating as-built documentation and training the maintenance team.

Conveyor system modernisation

Brief and challenge

Obsolete control technology caused unplanned downtime, but production could not be stopped for longer than a weekend window.

Our solution

  • Analysis of the existing state and splitting the retrofit into weekend shutdowns.
  • Replacement of frequency inverters and migration to a Siemens S7-1200 PLC.
  • New SCADA visualisation for the control room with per-section fault diagnostics.
  • Updating as-built documentation and training maintenance staff.

Project course

  1. 01

    Analysis

    Mapping existing cabling, drives and control logic, shutdown planning.

  2. 02

    Retrofit

    Phased replacement of inverters and cabinets, section-by-section PLC rollout.

  3. 03

    Visualisation and service

    SCADA for the control room, maintenance training, subsequent service supervision.

Result

  • The modernisation was completed without any loss of production time.
  • Maintenance can locate a fault to a specific section within seconds.
  • Reduced unplanned downtime of the conveyor route.

We share detailed project parameters on request, to the extent permitted by our contractual arrangements with the customer.